Light steel structure building real smart building, digital building, green building
Cold-formed steel building system is referred to as light steel structure building or prefabricated building. Its main material is light steel keel synthesized by hot-dip galvanized (aluminum plated zinc) with wall thickness of 0.8mm~3.0mm. As a structural form of main bearing members or main enclosure system members, U-type and C-type light steel materials are connected to the wall frame through self-tapping and self-drilling screws. The spacing is generally 300~600mm, the interior is filled with thermal insulation and sound insulation materials, and the two sides are installed with structural plates or envelope plates, jointly forming a “slab structure”. It is mainly used in low-rise (3 floors and below) and multi-storey houses (6 floors and below). After accurate calculation and support and combination of auxiliary parts, it can play a reasonable bearing capacity to replace traditional houses.
Fabricated building, refers to the factory production of fabricated parts, assembled on the site of the house, is an important part of the industrial housing, with standardized design, production, construction and assembly, decoration integration, management information and other characteristics.
The construction technology of light steel structure low-rise housing is evolved on the basis of North American style wood structure construction technology. After 50 years of development, integrated architecture has been gradually recognized in many countries, especially in the United States and Australia is widely adopted. Integrated building technology is also improving day by day. Now, integrated building has been widely used in China. Simplicity, safety and innovation will also be the development direction of integrated building in the future.
1、safe anti-seismic, anti-pressure and windproof
CFS building is made of modular building system,which is sturdy and durable.Strong compressive strength and wind resistance can with stand force 12 hurricanes and 8 degrees earthquake to ensure the safety.
DAHE use new-tech CFS building materials moreover much better in sound proof,fire proof anti-moisture,anti-termite,and anti-mildew to make CFS building more and more comfortable.
2、Standardized production Factory batch prefabrication
DAHE CFS building,mainly rely on mechanical equipment and a small number of manual mass production on the factory assembly line to achieve professional division of labor and higher production efficiency,indoor construction conditions and standardized construction process more can ensure the quality of products.
3、Movable easy to move,easy to install
DAHE CFS building is constructed by different standard modular parts which can easily adapt to the traditional transportation can be transport to everywhere DAHE CFS building is movable,flexible for transportation installation or removal.
4、green environment friendly,healthy and comfortable
DAHE CFS building use green materials,formaldehyde free radioactive elements free. VOC free or any other harmful elements to human health. Dry-type green construction is adopted for a CFS building to avoid damage to the environment. The construction process is clean and green: 100% of the steel materials can be recycled;above 80% water can be saved and reduce 70% construction waste above 80% of the supporting materials can be recycled.
5、Energy conservation and sound insulation,anti-corrosive and fireproof
All CFS building parts components and materials of a light gauge steel framing housing are customized, with good density and great precision The steel skeleton is made of super-anticorrosive high-strength cold-rolled galvanized plates which will remain undamaged for at least 100 years.All materials are incombustible and fireproof. Spaces between exterior and interior walls and between floor joists are filled with glass wool for heat and sound insulation.
6、Fast construction,high quality
DAHE CFS building is suitable for industrialized and standardized production and constructed in manner of production and pre-assembly at factory and final assembly on site. Compared to a concrete building its construction duration is shortened by1/3;structure construction is synchronized with water electricity and gas installation.